OCN Spot On Technology was being engaged by TITAN to carry out engineering design and authority approval for a new 6 km 600mm diameter water pipeline linking an existing Syarikat Air Johor reservoir to TITAN plant in Pasir Gudang. The water pipeline design involved many challenges due to various types of underground utilities presence along the way ranging from PETRONAS gas pipes, TNB high voltage cables, Water pipes, etc. The work includes few pipe jacking at more about 6m deep, road crossings at major junctions which required proper Traffic Management Plans, etc. OCN Spot On Technology manged to work closely with the main contractor and the local authorities in managing design changes required due to site constraints and deliver the project to TITAN on time for the expansion pre-commission in 6 months.