News

  • Home
  • About OCN
    • OCN Group
    • Licenses
    • HSE-Q
  • Our People
  • Industries
    • Refinery and Petrochemical
    • Pharma and Life Sciences
    • Power Generation
    • Renewables
    • Water
    • Commercial & Industrial Building
  • Services
    • Project Management
    • Design and Engineering
    • Authority and Permitting
    • Project Services
    • Construction Management
    • Start-up and Commissioning
    • Turnarounds and Maintenance
  • Construction
    • Structures
    • Tank Farm & Storage Systems
    • Metallic Piping
    • Non Metallic Piping
    • Electrical, Instrument and Controls
    • Mechanical – Static Equipment
    • Mechanical – Rotating Equipment
    • Turnarounds
    • Building M & E
  • Contact Us
    • Malaysia Office
    • Singapore Office
    • Request for Quotations
    • Vendors & Subcontractors Register
    • Jobs Enquiries

Home / News / May 2020 OCN awarded electrical instrument and control installation package by HQC Engineering Sdn Bhd for the GPS LNG Terminal Port Klang.

May 2020 OCN awarded electrical instrument and control installation package by HQC Engineering Sdn Bhd for the GPS LNG Terminal Port Klang.

  • Home
  • About OCN
  • Our People
  • Industries
  • Services
  • Construction
  • Projects
  • Contact Us

Malaysia Office
Block A, Unit 7-38, IOI Boulevard
Jalan Kenari 5, Bandar Puchong Jaya
47170, Puchong, Selangor Darul Ehsan
Malaysia.

Singapore Office
No. 2, Serangoon North Avenue 5,
#08-01, Singapore 554 911

Delivering World Class Project Solution

Copyright © OCN Constructors Sdn Bhd. (910711-U).
Website Design by Nuweb