Projects

  • Home
  • About OCN
    • OCN Group
    • Licenses
    • HSE-Q
  • Our People
  • Industries
    • Refinery and Petrochemical
    • Pharma and Life Sciences
    • Power Generation
    • Renewables
    • Water
    • Commercial & Industrial Building
  • Services
    • Project Management
    • Design and Engineering
    • Authority and Permitting
    • Project Services
    • Construction Management
    • Start-up and Commissioning
    • Turnarounds and Maintenance
  • Construction
    • Structures
    • Tank Farm & Storage Systems
    • Metallic Piping
    • Non Metallic Piping
    • Electrical, Instrument and Controls
    • Mechanical – Static Equipment
    • Mechanical – Rotating Equipment
    • Turnarounds
    • Building M & E
  • Contact Us
    • Malaysia Office
    • Singapore Office
    • Request for Quotations
    • Vendors & Subcontractors Register
    • Jobs Enquiries

OCN Constructors Sdn Bhd / Projects / Structures

  • Asbestos Removal
  • Structures
  • Tank Farm and Storage Systems
  • Mechanical Works – Piping
  • Mechanical Works – Static
  • Mechanical Works – Rotating
  • Turnarounds
  • Building M & E
  • Bio-diesel / Bio-mass / Oleo

Structures

DescriptionsClientLocation
Engineer, fabricate and deliver stairway structure and hinge tables for air risers – ThailandJohn Zink CompanyThailand
Engineer, fabricate, and install: derrick structure; 1st stage 24” riser and drum; 2nd stage 48” riser and drum; MP flare riser and drum; air riser; ladder and platform; template; utility piping and conduit.John Zink Company

Malaysia

Engineer, fabricate and install flare system for Aldwich’s Waste Oil to Diesel Recycling PlantTrisystem Teknik Sdn BhdMalaysia
Engineer, fabricate and deliver: thermal oxidizer c/w insulating modules and castables (reftractory; steam assisted flare system; utility piping; platforms and ladders.John Zink Company, Tulsa, USASingapore
Engineer, fabricate and deliver: boiler equipment, de-dustor, moving floor, coolingvVessels, and bottom ash ESB.Vyncke N.VMalaysia
Engineer, fabricate, test and deliver FOB Port Klang one unit demountable flare system: air riser; gas riser; hinged table; steam piping; guide arms; lifting beam; and air ductingJohn Zink CompanyMalaysia
Engineer fabricateand dleiver moving floor and steelwork for ESB.Vyncke N.VSingapore

Design, fabricate,install and test M150 Dedustor,

Vyncke N.V

Malaysia

Fabricate, install 7m thickener for Selinsing Mine Project at Kuantan.

PWA SEA Sdn. Bhd.Malaysia
Fabricate and install RAGM thickener bridge for Raub Gold Project at Kuantan.

PWA SEA Sdn. Bhd.

Malaysia

Engineer, fabricate and install: reclaim and solid handling structure platform and filter.

Palm Oleo (Klang) Sdn. Bhd.

Malaysia
Fabricate and install of 24m Thickener Bridge for Roymec.PWA SEA Sdn. Bhd.Malaysia

Engineer and fabricate (6) units of vibrating grate stokers.

Mackenzie Industries Sdn BhdMalaysia

Modify two (2) nos of existing cranes at North Port, Klang.

Cargotec Terminal Solution Sdn BhdMalaysia
Design, fabricate and erect workshop building at SepangGan Hia Building Construction Sdn BhdMalaysia
Design, fabricate, install, test & commission lime plant comprising: stainless steel tanks and silos; stainless steel piping; support structures including platforms and ladders; equipment installation

Omya Malaysia Sdn Bhd

Malaysia
  • Home
  • About OCN
  • Our People
  • Industries
  • Services
  • Construction
  • Projects
  • Contact Us

Malaysia Office
Block A, Unit 7-38, IOI Boulevard
Jalan Kenari 5, Bandar Puchong Jaya
47170, Puchong, Selangor Darul Ehsan
Malaysia.

Singapore Office
No. 2, Serangoon North Avenue 5,
#08-01, Singapore 554 911

Delivering World Class Project Solution

Copyright © OCN Constructors Sdn Bhd. (910711-U).
Website Design by Nuweb