Projects

  • Home
  • About OCN
    • OCN Group
    • Licenses
    • HSE-Q
  • Our People
  • Industries
    • Refinery and Petrochemical
    • Pharma and Life Sciences
    • Power Generation
    • Renewables
    • Water
    • Commercial & Industrial Building
  • Services
    • Project Management
    • Design and Engineering
    • Authority and Permitting
    • Project Services
    • Construction Management
    • Start-up and Commissioning
    • Turnarounds and Maintenance
  • Construction
    • Structures
    • Tank Farm & Storage Systems
    • Metallic Piping
    • Non Metallic Piping
    • Electrical, Instrument and Controls
    • Mechanical – Static Equipment
    • Mechanical – Rotating Equipment
    • Turnarounds
    • Building M & E
  • Contact Us
    • Malaysia Office
    • Singapore Office
    • Request for Quotations
    • Vendors & Subcontractors Register
    • Jobs Enquiries

OCN Constructors Sdn Bhd / Projects / Building M & E

  • Asbestos Removal
  • Structures
  • Tank Farm and Storage Systems
  • Mechanical Works – Piping
  • Mechanical Works – Static
  • Mechanical Works – Rotating
  • Turnarounds
  • Building M & E
  • Bio-diesel / Bio-mass / Oleo

Building M & E

DescriptionsClientLocation
Office Park Development at The Habour Front(HF 1 & HF 2) – gas, piping and drainage servicesLend Lease S’pore Pte Ltd / GDSSingapore
Biomedical R&D Complex – 7 Tower Blocks and 3 level of Basement at North Buona Vista Drive – piping & gas services, minor sewer work, and lightning protection including pH monitoring system.Bovis Lend Lease LtdSingapore
2 blocks of 9-Storey R&D block on 1st Storeywarehouse with basement carpark on Lot A20639 Mk 24at Kallang Sector – piping and gas servicesBLL / Apha / GDS ( Design & build)Singapore
5-Storey Office Development at 29 & 30Hong Kong Street – piping, acmv, dry riser and fire hosereel installationBLL / JRPSingapore
6-Storey extension with 2 Basement to the existing Centrepoint Shopping Centre at 176 Orchard Road – piping and gas systerms.Bovis Lend Lease LtdSingapore
Schering Plough Tablet Facilities (Bio-Tech) extension at 60 Tuas West Drive and Tablet Facilities Building at 70 Tuas West Drive – piping & drainage and process waste servicesBovis Lend Lease LtdSingapore
Biopolis @ North Buona Vista Road Piping, Gas, Drainage and Minor Sewer WorksSamsung C&T CorporationSingapore
Mechanical & electrical works for Sentosa GolfClub – Phases 2 and 3BLL / JRPSingapore
Utilities Services for Davos Life Science at16 Tuas South Street 5 – condensate, nitrogen, process,LP steam, waste gas & potable water installationLend Lease / RSP / KimtechSingapore
Air-conditioning & mechanical ventilation works at various transmission sub-stations for SP Powergrid: Pandan, Seraya, Labrador 400kV, Bishan MRT, Peng Nguan, and Tanjong Rhu.SP Ppower Assests, GDS ( Design & build)Singapore
Extension of level 2 north wing lab for ICES – air-conditioning& mechanical ventilation installationInstitute of Chemical & engineering Sciences /PCRSingapore
Refurbishment of Australian High Commission Building Singapore – air-conditioning & mechanical ventilation installation, and piping servicesBovis Lend Lease LtdSingapore
Australian International School, SingaporeExtension – air-conditioning & mechanical ventilation andfire protection installationLend Lease S’pore Pte LtdSingapore
Term contract maintenance of mechanical & electricalworks at Biopolis for BSF and SBIC for a period of 18 monthsJTC Consultant / SamsungSingapore
Strata bungalow development, 18 units of 2-storey bungalow at Lornie Road – mechanical and electrical worksElead Associates PteSingapore
ANI Singapore Expansion Project for Abbott Nutrition International at Tuas 7 / 10 – fire main piping, drainage, process / utility / laboratory piping and above ground piping & hydraulic services – coldwater supply, waste & venting system, process &utilities drain / venting system.Lend Lease / RSP / KimtechSingapore
Bio-Pharmaceutical Plant at TuasBay Link / Tuas South Avenue 9 for Genentech – piping worksJacobs Lend Lease / RSpSingapore
Australian International School, SingaporeExtension – piping, & minor sewer diversion workLend Lease S’pore Pte LtdSingapore
7-Storey Commercial Building with 3 Basement Orchard Road / 313 Somerset Road – air- conditioning & mechanical ventilation and BMS installation (Green Mark – Platinum)PSC Corporation / DMSSingapore
Upgrading of M&E systems to existing Hangar 97 Sembawang Air BaseDSTASingapore
Replacement of mechanical ventilation fan system for main building staircase at National University hospitalNUH / GDSSingapore
Commercial Building Orchard Road / 313 Somerset Road – piped services installation, hydraulics – piping & gas (GreenMark – Platinum)Bovis Lend Lease LtdSingapore
REC B&I Singapore Project at Tuas SouthAvenue 5 / Avenue 14 – potable water & miscellaneous piping works (Green Mark – Gold Award)BLL / AphaSingapore
REC Singapore Project – Cell 2A C42 andModule 3A C42 – piping worksBLL / AphaSingapore
Wyeth Singapore Extension S40 Project -C42 aboveground process waste drainage systemSyneryg / KL Au & AssociatesSingapore
Lonza Biologics Expansion Singapore Plant 2at 151A Tuas South Avenue 6 – underground utilities( piping, natural gas piping, newater & potablewater piping, chemical drain piping and fire protectionpiping) and aboveground piping worksJacobs Lend Lease / RSpSingapore
REC Singapore Project – Cell 2A C60A andModule 3A C60B – underground servicesBLL / AphaSingapore
Australian International School, SingaporeExtension (Phase 3) – air-conditioning & mechanical ventilation installationLend Lease S’pore Pte LtdSingapore
Alcon S’pore Manufacturing Plant ASM01 Project Supply, Delivery & installation of underground drainage, and piping worksJacobs Lend Lease / RSpSingapore
Alcon Singapore Manufacturing ASMO1 ProjectProject (Phase 1)- underground process drainage and piping works (Green Mark – Gold Award)Jacobs Lend Lease / RSpSingapore
Roche Singapore Campus Integration Phase 2at Tuas South Avenue 6 – piping works (landscape) and sewer diversion (Green Mark – Gold Award)Jacobs Lend Lease / RSpSingapore
Australian International School, SingaporeExtension (Phase 3) – piping, & gas systemLend Lease S’pore Pte LtdSingapore
General industry development Jalan Tukang / Lorong Tukang Dua for Grundfos (GreenMark – Platinum)BLL / Apha / GDS ( Design & build)Singapore
2 year maintenance contract mechanical ventilation fansat Paya Lebar 400kV sub-stationPublic Utilities BoardSingapore
Single storey factory with 2-storey ancillary building at Seletar Aerospace Park for Rolls Royce piping, process water, natural gas, waste water treatment plant, acid waste collection and chemicaldisposal system (Green Mark – Platinum)BLL / GDS ( Design & Build)Singapore
General industry development Jalan Tukang / Lorong Tukang Dua for Grundfos – piping & compressed air system (Green Mark – Platinum)BLL / GDS ( Design & Build)Singapore
7/8-storey office cum carpark to existing shipyard development at51 Pioneer Sector 1 – air- conditioning & mechanical ventilation works (Green Mark certified)BLL / JRPSingapore
Parkway Parade – air-conditioning &mechanical ventilation and fire protection worksLend Lease S’pore Pte LtdSingapore
Stamford American International Schoolat Upper Serangoon Road – air-conditioning &mechanical ventilation installationLend Lease S’pore Pte LtdSingapore
Upgrading works to Lucky Plaza @Orchard- mechanical & electrical installationBLL / JRPSingapore
Phase 5 development comprising 1 blockof 4-storey workshop & 1-storey auxiliary workshop at existing Loyang Offshore Supply Base – air-conditioning & mechanical ventilation works and compressed air systemSquire Mech Pte LtdSingapore
Development laboratory expansion at Lonza Cell Therapy Project Singapore at TuasSouth Avenue 6 – L1 underground and above ground piping servicesJacobs Lend Lease / RSpSingapore
Stamford American International Schoolat Upper Serangoon Road – piping, gas,sewer diversion and swimming pool installationLend Lease S’pore Pte LtdSingapore
Design, fabricate, supply, install, commission,operate and maintain real time VOC remotemonitoring systemPublic Utilities BoardSingapore
Replacement of Potable Water Tanks A & C andWet Riser Tank E at Lucky Plaza @OrchardBLL / JRPSingapore
16-storey building with 3 basement with 5-storey shopping complex and 11-storey office tower at Jurong Gateway Road / Boon Lay Way- air-conditioning & mechanical ventilation, piping, gas, and BMS installation (Green Mark – Platinum Plus)PSC Corporation / DMS/ Lend Lease S’pore Pte LtdSingapore
Marina Coastal Expressway Contract 486 piping worksSamsung C&T CorpnSingapore
ID FACADE LIGHTING (LE1) INSTALLATION FOR LGB TOWER – Electrical Work for ID

Facade Lighting (LE1) Installation.

PSC Corporation / DMSMalaysia
ID FACADE LIGHTING (LE2) INSTALLATION FOR LGB TOWER – Electrical Work for ID

Facade Lighting (LE2) Installation.

PSC Corporation / DMSMalaysia
Electrical Work for ID Facade Lighting (LE1) Installation.Global Wall (M) Sdn. Bhd. / GSL Development Sdn. Bhd.Malaysia
Electrical Work for ID Facade Lighting (LE2) Installation.Global Wall (M) Sdn. Bhd. / GSL Development Sdn. Bhd.Malaysia
1 tower of 11-storey & 1 tower of 18-storey research building with 3 basements Fusionopolis Way / AyerRajah Avenue – utility piping and chemical waste pipingGS Engrg & ConstructionSingapore
4-storey Fa-Tang buildingto replace extg Siong Lim Temple – monument siteat 184 Jalan Toa Payoh – air-conditioning &mechanical ventilation and fire protection worksEmplus Consulting Engrs P/LSingapore
Redevelopment to extg 3-storey TreasureResort Hotel with a new 6-storey hotel extension at23 Beach View, Sentosa – piping, gas installationBescon Consulting EngineersSingapore
Pfizer bulk pharmaceutical chemical facility onPlot A18927, Lots 2698M Pt and 2766N Pt Mk 7 At TuasSouth Ave 6/Ave 7 – inground fire & gas services, potable & industrial water, piping,, process waste piping and purity gas piping systemBovis Lend Lease LtdSingapore
  • Home
  • About OCN
  • Our People
  • Industries
  • Services
  • Construction
  • Projects
  • Contact Us

Malaysia Office
Block A, Unit 7-38, IOI Boulevard
Jalan Kenari 5, Bandar Puchong Jaya
47170, Puchong, Selangor Darul Ehsan
Malaysia.

Singapore Office
No. 2, Serangoon North Avenue 5,
#08-01, Singapore 554 911

Delivering World Class Project Solution

Copyright © OCN Constructors Sdn Bhd. (910711-U).
Website Design by Nuweb